auto_awesome MISAC delivers industry-specific ERP modules in under a week NEW
Products Industries MISAC Drishti MISAC Sopan MISAC Business Platform System Audit Blog About Help Center WhatsApp: +977-9843657489 Get a Free Demo
8 guides

Manufacturing

Production orders, finished goods and product costing.

  1. Cost Allocation Rules Screen

    Rules that spread a shared pool of cost (power, factory rent, supervision) across the products, cost centres or work centres that caused it, instead of leaving it in one expense account.

  2. Cost Drivers Screen

    The list of bases an overhead cost can be shared out on: machine hours, labour hours, output tonnage, floor area, headcount and so on.

  3. Cost Element Ledgers Screen

    The accounts your production costs are collected in (power, factory labour, factory overhead and the like), with what kind of cost each one is and how it behaves.

  4. Finished Goods Received Screen

    Finished Goods Received (FGR) takes the products made in a production run into stock.

  5. Overhead Budget Screen

    What you expect a period's overhead to cost, and the output volume you expect to spread it over.

  6. Product NRV Screen

    The net realisable value of an item at a month end: what one unit should fetch, less what it still costs you to finish and sell it.

  7. Production Capacity Screen

    What a production unit could normally produce in a period, what it actually produced, and the fixed overhead that period carried.

  8. Production Order Screen

    A Production Order plans one manufacturing run.

Still stuck?

Open Help inside MISAC to raise a ticket with your screen attached, or talk to us directly.